Removal of the airbox and throttle body
Disconnect the fuel injectors (13) from the main wiring loom.
Remove the retaining clips (A).
Loosen the clamps (1) securing the throttle body to the intake manifolds (B).
Disconnect the wiring connector (C) connecting the stepper motor (33) to the main wiring harness.
Disconnect the wiring connector (D) connecting the throttle position sensor (2) to the main wiring loom.
Slacken off the clamp (21) securing the hose (18) to the blow-by valve.
Withdraw the airbox (20) complete with the throttle body (11) and the fuel injectors (13).
Removal of the fuel injectors
Unscrew the bolts (3) to remove the fuel injectors (13) complete with hoses (14) and (16) from the airbox.
Refitting the injectors
Check that the injector O-ring seals (2) are present.
Position the hoses and unions (5), (6), (14), (15) and (16) with the fuel injectors (13) on the airbox (20) in the corresponding yellow clips (F).
apply the recommended threadlocker to the bolts (3).
Tighten the bolts (3) to the specified torque (Sect. C 3, Frame torque settings).
Removal of the stepper motor
The stepper motor is installed in the central part of the throttle body:
to remove the motor, unscrew the two bolts (G) and disconnect the hoses (H) and (31) from the throttle body and from the airbox. Refer to Section M 3, Stepper motor for details of stepper motor operation.
Refitting the stepper motor
Attach the hoses (H) to the throttle body and hose (31) to the pressure test fitting (30) of the airbox. Fit the stepper motor hose (31) connecting the “short” end to the fitting (L) on the throttle body (11) and the “long” end to the fitting previously installed on the airbox (20). Locate the stepper motor with its support on the throttle body, inserting the bolts (G).
Tighten the bolts (G) to the specified torque (Sect. C 3, Frame torque settings).
Disassembly of the airbox – throttle body
Unscrew the six bolts (8). Disconnect the hose (31) from the pressure test fitting (30). Remove the throttle body (11) from the airbox (20).
 
Reassembly of the airbox – throttle body
If removed, fit the gaskets (9) in the seating (M) on the airbox (20).
If removed, screw in the fitting (30) and tighten to the specified torque (Sect. C 3, Frame torque settings).
Secure the fuel hose (5) from the injectors to the airbox (20) using a small cable tie, as shown.
Fit the fuel hoses (N) connecting them to the fitting (5).
Secure the hoses (N) with the clips (27), positioning them as shown.
Fit the hose guide (23) to the airbox, positioning it as shown; apply the recommended threadlocker to the bolts (24) and insert the bolts (24), interposing the washers (22) between the hose guide and the airbox.
Tighten the bolts (24) to the specified torque (Sect. C 3, Frame torque settings).
If removed, install the gaskets (10) in their grooves on the air intake funnels.
If removed, refit the air intake funnels (7) to the throttle body (11), apply the recommended threadlocker to the bolts (12) and tighten them to the specified torque (Sect. C 3, Frame torque settings) in the sequence indicated.
Refit the throttle body (11) to the airbox (20), positioning it so that the control pulley (O), when installed, is located in correspondence with the recess (P) on the airbox, as shown.
Secure the throttle body (11) to the airbox (20) with the bolts (8).
Connect the hose (26) to the pressure test fitting (15).
Tighten the six bolts (8) to the specified torque (Sect. C 3, Frame torque settings), in the sequence indicated.
If removed, refit the throttle cables to the throttle body as indicated: insert the throttle opening cable (P) and the throttle closing cable (Q) in their respective locations on the throttle body plate, as shown in the figure
Insert the cable end fittings (S) in their respective notches on the pulley. Secure the cables (P) and (Q) in the position shown with the nuts (R). Tighten the nuts (R) to the specified torque (Sect. C 3, Frame torque settings).
Reposition the dust sleeves (O) tight against the nuts (R).
Check that the throttle opening cable (P) and the throttle closing cable (Q) are secured in the retaining clip (Z).
If removed, refit the cable guide (23), bolt (24) with the recommended threadlocker, and the two washers (22). Tighten the bolt (24) to the specified torque (Sect. C 3, Frame torque settings).
Fit the drain hose (19) inserting it fully in the fitting on the airbox (20).
Position the drain hose so that the notch on the hose locates on the nib (T) on the fitting, as shown in the figure.
Secure the hose with the clamp (29).
Refitting the airbox and throttle body
Locate the hose clamps (1) in the seats on the intake manifolds (B).
Position the airbox (20) and the throttle body (11) on the motorcycle.
Tighten the clamps (1) to the specified torque (Sect. C 3, Frame torque settings).
Connect the main wiring loom connectors to the injectors (13) and secure them with the clamps (A).
Reconnect the wiring connector (C) connecting the stepper motor (33) to the main wiring loom.
Reconnect the wiring connector (D) connecting the throttle position sensor (E) to the main wiring loom.
 
Reconnect the hose (18) to the blow-by valve and tighten the clamp (21).
 Important
If the throttle body is renewed, carry out the procedure to reset the TPS (Sect. D 5, Resetting the throttle position sensor (TPS)).
 